REMOTE CONSTRUCTION & BUSINESS SUPPORTNEW JERSEY · NEW YORK · CONNECTICUT
LCS — Landmark Construction Support
Work samples

Inspect the handoff.
Understand the format.

Illustrative examples of how scope, quantities and follow-up information can be organized. These are demonstrations, not completed client projects.

PDF markup formatQuantity registerScope & opportunity notes
Illustrative concrete scope markup with slab S1 and footings F1ABC12S1 / SLAB AREAF1SCOPE BOUNDARYILLUSTRATIVE PLAN · NO SCALE · NOT FOR CONSTRUCTION
01 / Measurement traceability

See the measured boundary.

A drawing markup identifies the element being measured, the source reference and the agreed scope boundary.

  • Element tags connect the plan to workbook lines.
  • Revisions are recorded against the source drawing set.
  • Unclear details become scope questions.

This schematic has no scale and is not an engineering design. It is not the source of the fictional quantities in the next example.

Scope notes / Example

The notes are
part of the deliverable.

A handoff should make its limitations understandable. These example notes show the types of questions recorded, not conclusions about a real project.

01

Drawing basis

List the exact supplied drawing numbers and revision dates used for the assignment.

02

Assumption

Identify an unclear thickness, dimension or scope boundary and the measurement basis applied.

03

Open clarification

Record items that require the client’s decision before pricing or bid submission.

Need a sample relevant to your scope?

Tell us the trade and output you need. We can discuss an appropriate example and the proposed handoff.

Request a relevant sample